BAS bond seeks to improve safety, infrastructure, classrooms

October 26, 2026

Sharing is caring!

Brighton Area Schools is asking voters to consider a $90.275 million bond proposal on the Nov. 3, 2026, ballot to address safety and security needs, maintain aging facilities, and improve learning spaces across the district.

The proposed projects include district-wide safety systems, secure school entrances, traffic improvements, classroom renovations, updated science and music learning spaces, elementary gymnasiums, and repairs to aging roofs and cooling equipment. The proposal also includes improvements to the Brighton Performing Arts Center, a facility that serves students and the broader community.

“Brighton’s schools have helped generations of students build careers and contribute to their communities,” said Brighton Area Schools Superintendent Matt Outlaw. “This proposal addresses practical needs across our schools, including safer entrances, reliable building systems and classrooms that support how students learn today. We encourage residents to review the projects and welcome their questions.”

What would the no tax rate increase bond fund?

• Safety and security: District-wide lockout systems, secure entrances at Hornung and Spencer, traffic improvements at elementary campuses and Maltby and enclosed porches at Hornung so children can reach classrooms through protected interior routes.

• Classrooms and student support: Renovated special education classrooms and a relocated music room at Hawkins, plus updates to roughly a dozen remaining classrooms at Maltby.

• Elementary classrooms: Separate gyms at Hilton, Hornung and Spencer would resolve conflicts between lunch and physical education. These changes would also allow existing spaces to be reconfigured for instruction and student support. The proposal would add at least two classroom learning spaces in each of the district’s four elementary schools.

• Science and music instruction: Updated science classrooms at Scranton and Brighton High School, additional orchestra space at Scranton and improved band and orchestra spaces at the high school.

• Infrastructure: Replacement of Maltby’s roof, which is more than 30 years old, along with aging roofing and cooling equipment at Brighton High School, boilers, technology, and other infrastructure needs.

• Performing arts center: Replacement seating, acoustic-system improvements and dressing-room ventilation to maintain a facility serving students and the broader community.

Bond proposal would maintain current tax rate

No increase to tax rate:  Debt millage would remain at 2.73 mills for approximately six years – The chart below shows the 59% decline in the district’s debt millage rate over the past few years. The rate is scheduled to drop again in 2027. The proposed bond would maintain the rate at that lower level for approximately six years before it drops again.

Brighton Area Schools’ 2.73 millage rate is among Michigan’s lowest. At 2.73 mills, it is the lowest in the county, the lowest in Brighton since at least 1987, and among the state’s lowest.

How to learn more about the Nov. 3 bond proposal

Residents can learn more, submit questions, or contact that district using the following resources:

District website – https://www.brightonk12.com/district/bond-information.

Submit a question – Bond Questions

Email – outlawm@brightonk12.com

Phone – (810) 499-4040

Video overview of the bond is below:

The Livingston Post

The Livingston Post is the only locally owned, all-digital information and opinion site in Livingston County, Mich. It was launched by award-winning journalists who were laid off from the Livingston County Daily Press & Argus by Gannett Co. Inc. in 2009.

Leave a Reply

Your email address will not be published.

DON’T MISS A BEAT

Sign up for our weekly newsletter

We don’t spam!

Top

Don't miss this post